The Irving K. Barber Learning Centre is getting a bit of a facelift with some upcoming maintenance.

The flooring replacement project, set to begin June 29, will replace flooring on levels 1 and 2, and the foyer area on level 2. Although the main work will take place at night, there may be certain sections of hallways that will be unavailable during the day.

Please look for signage within the building to direct you to alternate pathways when areas are closed.

The project is expected to be completed in mid-August.

Thank you for your patience.

a place of mind, The University of British Columbia

UBC Library

Info:

604.822.6375

Renewals: 

604.822.3115
604.822.2883
250.807.9107

Emergency Procedures | Accessibility | Contact UBC | © Copyright The University of British Columbia

Spam prevention powered by Akismet