Figure 7. Proposed Development Projects in BC overlapping with existing wetlands.
Figure 8. Six criteria inputs for Multi Criteria Evaluation (MCE): Agriculture, Built-up area, Groundwater, Slope, Soil Drainage & Stream Proximity.
Figure 9. Weighted and equally weighted Multi Criteria Evaluation (MCE) models.
Figure 10. Areas of high suitability overlap in two Multi Criteria Evaluation (MCE) models.
Figure 11. Overlap of existing wetland and proposed areas for wetland creation.