During the last week, our group divided into three subgroups to work on sketch up, cost estimation, and work plan/scheduling. We had a meeting with our professor to make a clarification on cost estimation, and she gave us a “RSMeans cost data” that we used to come up with a final cost. however, as our client mentioned earlier some of the building products and labour was donated to them. so we tried our best to eliminate the cost of donated goods. At this stage of our project we are trying to come up with the format of the final report.