Construction is underway for the wall mock-up. The images below show the building progress.
Framing
Structure is screwed together
Sheathing
Sheathing is screwed into structure.
Roof and window installation
Built up exterior insulation on roof
Air Sealing, window trim, waterproofing membrane over sill
Exterior insulation, flashing, strapping
Detailed view of window flashing and trim blocking. Notice insulation wraps around blocking
Detailed view of lower sill insulation and waterproofing membrane. Vapour-permeable waterproof membrane is installed in two parts, first around will and window pan then, after the window is installed, second membrane is wrapped over insulation beneath window.
Cavity insulation, interior air sealing, interior window finishes
Hemp batt insulation in wall cavity
Vapour-permeable air sealing tape on window interior
wood fibre insulation and sill support on interior of window