Client Meeting – Oct 28, 2014

These meeting minutes were taken by Maria.

Meeting Minutes – October 28th, 2014

Attendees: Eric Molendyk (E.M.), Maria Serbanescu (M.S.), Mustafa Mussayev (M.M.), Oscar Yang (O.Y.), Weng Fei Yu (W.Y.), Michael Li (M.L.), Duane Geddes (D.G.), and two other Capstone groups

Location: Tetra Society office, Suite 318 – 425 Carrall Street, Vancouver BC

Topics of Discussion Meeting Notes (bolded lines indicate action items)
Intro Overview of Sam Sullivan Disability Foundation and Tetra Society by D.G.

We are welcome to join any volunteer meetings (next one is Nov 17 at 7pm at APEGBC office in Burnaby)

Project Resources We can have access to:

  • Woodworking shop
  • Metalworking shop
  • Water jet cutter
  • Wheelchair
  • Volunteer engineer brainstorming session

We just have to ask and give enough notice

IP / NDA Forms M.S. to send IP / NDA forms to Eric for signing
Project Specific Max weight for load cell: 500 – 600 lb

Error tolerance: ± 5 lb

E.M. to send M.S. wheelchair dimensions

M.S to send E.M. project proposal

Leave a Reply