Each of these assignments is group work, and only submission need be made per group.
- WCET estimation and tools (due January 31 — 6% of total grade)
- Schedulability analysis and comparison between policies (due February 11 — 6% of total grade)
- Kernel-level implementation of resource allocation policies (due March 28 by 9:00 a.m. — 12% of total grade)
- Emulation and analysis of network switches + skeleton code (due April 8 — 6% of total grade)
- (optional) More about network switches (due April 17 — bonus 3% of total grade)