Category: “Write as rain”

: Alicia DeGelder, Karn Sangha, Russel Gerbrandt and Dakota Tryhuba.

Assignment 4:1 – Peer Review of Alicia DeGelder’s Application Package

To: Alicia DeGelder From: Dakota Tryhuba Date: March 28, 2019 Subject: Peer Review of Application Package Dear Alicia, As per our course instructions, I have just reviewed your rough draft application package. Overall, I am impressed with the quality of

Draft Application Package – Peer Review for Dakota Tryhuba – Alicia DeGelder

Hi Dakota, Thank you for your submission of the draft application package. Overall I found it to be very professional looking and your passion for your chosen field is very evident throughout, which I believe will make a great impression

Application Package – Draft – Karn Sangha

Hi team, I’ve enclosed my rough draft for my application package as a pdf. The package includes the job description, resume, cover letter, and three reference letters. Thank you in advance for taking the time to review my application and

Assignment 4:1 – Rough Draft Application Package

MEMORANDUM To: ENGL 301 Writing Team “Write as Rain” From: Dakota Tryhuba Date: March 26, 2019 Subject: Assignment 4:1 – Rough Draft Application Package Fellow Write as Rainers, As per course instructions, I have written a rough draft of my

Application Package – Draft – Alicia DeGelder

Hello team, Per assignment 4.1 instructions, I have enclosed my draft application package, which includes: Job posting information for a summer student position at the Biomedical Research Center at UBC Cover letter addressed to Mr. Dhesi of the Biomedical Research

Assignment 3:3 – Peer Review of Karn Sangha’s Formal Report Draft

Assignment 3:3 – Peer Review of Karn Sangha’s Formal Report Draft To: Karndeep Sangha From: Dakota Tryhuba Date: March 17, 2019 Subject: Peer review of formal report draft entitled “Proposal to increase pedestrian safety from identifying and analyzing rate and factors of pedestrian and

Peer Review Formal Report Draft for Alicia DeGelder

To: Alicia DeGelder From: Karn Sangha Date: 17 March 2019 Subject: Peer Review of Formal Report draft I have reviewed your formal report draft. Below is my review organized by the report sections. Introduction  Overall well written, introduces focus of the

Formal report draft – peer review for Russel Gerbrandt – Alicia DeGelder

To: Russel Gerbrandt From: Alicia DeGelder Date: March 17, 2019 Subject: Peer review of draft formal report: Deriving Stock Market Sentiment with Natural Language Processing   Thank you for submitting your draft report, please see below for my thoughts and

301_Research draft_Alicia DeGelder

Hello team, I have attached the current draft of my research into job burnout rates in Kelowna General Hospital technical service areas. Please note that there was a large delay in sending my survey out due to correspondence between myself

Formal Report Draft – Karn Sangha

Hello Write as Rain group, Enclosed is my Formal Report Draft.” Due to late survey responses, I have not conducted a proper analysis of the primary sources along with the secondary sources. Thank you for taking the time to peer

Top

Spam prevention powered by Akismet