{"id":228,"date":"2016-04-08T17:27:30","date_gmt":"2016-04-09T00:27:30","guid":{"rendered":"https:\/\/blogs.ubc.ca\/erosioncontrol\/?page_id=228"},"modified":"2016-04-08T18:25:59","modified_gmt":"2016-04-09T01:25:59","slug":"major-concerns","status":"publish","type":"page","link":"https:\/\/blogs.ubc.ca\/erosioncontrol\/major-concerns\/","title":{"rendered":"Problem Statement"},"content":{"rendered":"<header class=\"entry-header\">This page is to provide outlines of hazards, major concerns, and mechanism.<\/header>\n<header class=\"entry-header\"><\/header>\n<header class=\"entry-header\">As introduction\u00a0mentioned before,\u00a0<strong>Hazards\u00a0<\/strong>of erosion include:<\/header>\n<header class=\"entry-header\">\n<ul>\n<li><b>Risks of Public Safety<\/b><\/li>\n<li><b>Restrict City Landscapes and Ecological environment<\/b><\/li>\n<li><b>Decreased<\/b> <b>Urban Economy<\/b><\/li>\n<li><b>Influence on City Drainage System<\/b> \u2014&gt; \u2193Flood Prevention Capacity \u2014&gt; Flood<\/li>\n<li>\u2193 <b>Flood Storage<\/b> and <b>Discharge<\/b> in Reservoir Lake; Be <b>Adverse<\/b> to <b>Water Transportation<\/b>.<\/li>\n<\/ul>\n<\/header>\n<div class=\"entry-content\">\n<p>&nbsp;<\/p>\n<p><strong>Major Concerns:<\/strong><\/p>\n<ul>\n<li><strong>Deforestation and Degradation<\/strong><\/li>\n<li><strong>Construction Activities<\/strong><\/li>\n<li><strong>Expansion of Transportation Networks<\/strong><\/li>\n<li><strong>Storm Water Management<\/strong><\/li>\n<li><strong>Climate Change<\/strong><\/li>\n<\/ul>\n<p>(If you want to know about major concerns, please click the subpage named &#8216;Major concerns&#8217;, or click <a href=\"https:\/\/blogs.ubc.ca\/erosioncontrol\/major-concerns\/major-concerns-2\/\">here<\/a>.)<\/p>\n<p>&nbsp;<\/p>\n<p><strong>\u00a0Mechanism:<\/strong><\/p>\n<p style=\"padding-left: 30px;\">\u00a0Three main processes of the mechanism include\u00a0<strong>Detachment<\/strong>, <strong>Transport<\/strong>, and <strong>Deposition<\/strong>.<\/p>\n<p>(Details of erosion mechanism can found <a href=\"https:\/\/blogs.ubc.ca\/erosioncontrol\/major-concerns\/mechanism\/\">here<\/a>.)<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>This page is to provide outlines of hazards, major concerns, and mechanism. As introduction\u00a0mentioned before,\u00a0Hazards\u00a0of erosion include: Risks of Public Safety Restrict City Landscapes and Ecological environment Decreased Urban Economy Influence on City Drainage System \u2014&gt; \u2193Flood Prevention Capacity \u2014&gt; Flood \u2193 Flood Storage and Discharge in Reservoir Lake; Be Adverse to Water Transportation. &nbsp; [&hellip;]<\/p>\n","protected":false},"author":38463,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-228","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/pages\/228","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/users\/38463"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/comments?post=228"}],"version-history":[{"count":8,"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/pages\/228\/revisions"}],"predecessor-version":[{"id":249,"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/pages\/228\/revisions\/249"}],"wp:attachment":[{"href":"https:\/\/blogs.ubc.ca\/erosioncontrol\/wp-json\/wp\/v2\/media?parent=228"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}