The transfer of sediment into the flume began on September 9, 2014. The sediment mixture was created from a range of different sand and gravel mixes acquired from Target Products. The filling of the flume was completed several days later on September 16th. The total mass of sediment put into the flume was approximated to be just under 4 tonnes.