{"id":195,"date":"2021-08-11T10:17:41","date_gmt":"2021-08-11T17:17:41","guid":{"rendered":"https:\/\/blogs.ubc.ca\/jieunk\/?page_id=195"},"modified":"2021-08-11T10:17:41","modified_gmt":"2021-08-11T17:17:41","slug":"assignment-23-revised-progress-report-memorandum","status":"publish","type":"page","link":"https:\/\/blogs.ubc.ca\/jieunk\/assignment-23-revised-progress-report-memorandum\/","title":{"rendered":"Assignment 2:3 \u2013 Revised Progress Report Memorandum"},"content":{"rendered":"<p>To: Dr. Erika Paterson, Instructor ENGL 301 Technical Writing UBC<\/p>\n<p>From: Jieun Kim, Student ENGL 301 Technical Writing UBC<\/p>\n<p>Data: June 25, 2021<\/p>\n<p>Subject: Progress Report on Determining the Feasibility of Renovating the Rooftop patio at Pendrell Mews apartment<\/p>\n<p>&nbsp;<\/p>\n<p>As requested in assignment outline 2:3, I have completed my progress report on \u201cDetermining the Feasibility of Renovating the Rooftop patio at Pendrell Mews apartment.\u201d You will find this progress report below, in addition to the link to the report outline and survey questions.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Report Audience<\/strong><\/span><\/p>\n<p>The council at Pendrell Mews apartment: Pamella Palmer<\/p>\n<p>The committee has the authority to evaluate and practice the proposed solutions with the data collected through the past years and based on the building assessment.<\/p>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Report Purpose<\/strong><\/span><\/p>\n<p>This report is intended to determine the feasibility of renovating the rooftop patio at Pendrell Mews apartment.<\/p>\n<p>In order to do this,<\/p>\n<ul>\n<li>Collect data from residents on overall satisfaction with the rooftop patio<\/li>\n<li>Identify the existing problems and demands of the area<\/li>\n<li>Identify the scope of work and estimated expenses<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Report Significance<\/strong><\/span><\/p>\n<ul>\n<li>To bring attention to the need of renovating the rooftop patio<\/li>\n<li>To bring attention to the feasibility of renovating the rooftop patio and its benefit<\/li>\n<li>To continue maintaining Pendrell Mews with the highest standards while ensuring tenants\u2019 needs<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Work Completed<\/strong><\/span><\/p>\n<ul>\n<li>Initial investigation of the rooftop patio area to identify current problems<\/li>\n<li>Formal Report Outline:<a href=\"https:\/\/blogs.ubc.ca\/engl301-98a-2021sa\/2021\/06\/25\/83048\/\">https:\/\/blogs.ubc.ca\/engl301-98a-2021sa\/2021\/06\/25\/83048\/<\/a><\/li>\n<li>Survey Questions:<a href=\"https:\/\/ubc.ca1.qualtrics.com\/jfe\/form\/SV_eX87OxHKmV3O28u\">https:\/\/ubc.ca1.qualtrics.com\/jfe\/form\/SV_eX87OxHKmV3O28u<\/a><\/li>\n<li>Initial online research for the construction materials and design<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Research Plan<\/strong><\/span><\/p>\n<ul>\n<li>Deliver survey questionnaires to each unit upon approval<\/li>\n<li>Interview with the management council and the building manager<\/li>\n<li>Collect\/Analyze the results from the survey and interview to decide the scope of work<\/li>\n<li>Estimated cost analysis on each work scope of the renovation<\/li>\n<li>Estimate the duration of the construction<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p><span style=\"text-decoration: underline;\"><strong>Writing Schedule<\/strong><\/span><\/p>\n<ul>\n<li>July 3, 2021 \u2013 Draft \u2013 Introduction<\/li>\n<li>July 7, 2021 \u2013 Draft \u2013 Data Section including survey results\/analysis and space analysis<\/li>\n<li>July 11, 2021 \u2013 Draft \u2013 Data Section including the scope of work, estimated cost, schedule, and the challenges<\/li>\n<li>July 12, 2021 \u2013 Draft \u2013 Conclusion<\/li>\n<li>July 14, 2021 \u2013 Post Formal Report Draft on Team Forum<\/li>\n<li>July 27, 2021 \u2013 Revise the draft version to incorporate peer review<\/li>\n<li>July 28, 2021 \u2013 Post Final Formal Report on Team Forum<\/li>\n<\/ul>\n<p>&nbsp;<\/p>\n<p>Please advise if you require any further clarification. Thank you for all your assistance.<\/p>\n<p>&nbsp;<\/p>\n<p>Survey link: <a href=\"https:\/\/ubc.ca1.qualtrics.com\/jfe\/form\/SV_eX87OxHKmV3O28u\">https:\/\/ubc.ca1.qualtrics.com\/jfe\/form\/SV_eX87OxHKmV3O28u<\/a><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>To: Dr. Erika Paterson, Instructor ENGL 301 Technical Writing UBC From: Jieun Kim, Student ENGL 301 Technical Writing UBC Data: June 25, 2021 Subject: Progress Report on Determining the Feasibility of Renovating the Rooftop patio at Pendrell Mews apartment &nbsp; As requested in assignment outline 2:3, I have completed my progress report on \u201cDetermining the [&hellip;]<\/p>\n","protected":false},"author":85570,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-195","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/pages\/195","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/users\/85570"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/comments?post=195"}],"version-history":[{"count":5,"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/pages\/195\/revisions"}],"predecessor-version":[{"id":200,"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/pages\/195\/revisions\/200"}],"wp:attachment":[{"href":"https:\/\/blogs.ubc.ca\/jieunk\/wp-json\/wp\/v2\/media?parent=195"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}