{"id":9848,"date":"2023-09-05T12:32:59","date_gmt":"2023-09-05T19:32:59","guid":{"rendered":"https:\/\/blogs.ubc.ca\/lfsgrads\/?p=9848"},"modified":"2023-09-05T12:32:59","modified_gmt":"2023-09-05T19:32:59","slug":"hr-macmillan-power-shutdown","status":"publish","type":"post","link":"https:\/\/blogs.ubc.ca\/lfsgrads\/post-9848","title":{"rendered":"HR Macmillan &#8211; power shutdown"},"content":{"rendered":"<p>HR Macmillan users:<\/p>\n<p>Please be advised that there has been a request for two weekend power shutdowns to conduct the yearly main feeder maintenance work and to get the new air handler for 360 online.<\/p>\n<p><u>Full building power shutdown<\/u>: <strong>Saturday September 9<sup>th<\/sup> 7AM-3PM<\/strong><\/p>\n<p><u>South wing only power shutdown<\/u>: <strong>Saturday September 16<sup>th<\/sup> 7AM-11AM (tentative) **Areas effected: <em>Animal welfare, SALA, DAE &amp; Comms areas**<\/em><\/strong><\/p>\n<p>It is suggested that Faculty, staff and students shut down desktop computers, external USB devices and any sensitive equipment end of day, <strong>Friday September 8th<\/strong>. Fridges and freezers should be ok during this period as long as they are not opened. For those with -80\u2019s freezers\/sensitive equipment that could be negatively impacted during this shut down, please contact me at your earliest convenience to discuss potential power backup options.<\/p>\n<p>Any questions please contact <a href=\"mailto:andy.jeffries@ubc.ca\">andy.jeffries@ubc.ca<\/a><\/p>\n<p>Thank you,<\/p>\n<p><strong>Andy\u00a0Jeffries<\/strong><br \/>\nFaculty Operations Manager<br \/>\nFaculty of Land and Food Systems<br \/>\nThe University of British Columbia | Vancouver Campus | Musqueam Traditional Territory<br \/>\n48F \u2013 2357 Main Mall\u00a0|\u00a0Vancouver BC\u00a0|\u00a0V6T 1Z4 Canada<br \/>\nPhone 604 822 3488 | Cell 604 603 1619<br \/>\n<a href=\"mailto:andy.jeffries@ubc.ca\">andy.jeffries@ubc.ca<\/a><br \/>\n<a href=\"http:\/\/www.landfood.ubc.ca\/\">http:\/\/www.landfood.ubc.ca<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>HR Macmillan users: Please be advised that there has been a request for two weekend power shutdowns to conduct the yearly main feeder maintenance work and to get the new air handler for 360 online. Full building power shutdown: Saturday September 9th 7AM-3PM South wing only power shutdown: Saturday September 16th 7AM-11AM (tentative) **Areas effected:&hellip;<\/p>\n","protected":false},"author":18841,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3836],"tags":[],"class_list":["post-9848","post","type-post","status-publish","format-standard","hentry","category-news-and-events"],"_links":{"self":[{"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/posts\/9848","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/users\/18841"}],"replies":[{"embeddable":true,"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/comments?post=9848"}],"version-history":[{"count":1,"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/posts\/9848\/revisions"}],"predecessor-version":[{"id":9849,"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/posts\/9848\/revisions\/9849"}],"wp:attachment":[{"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/media?parent=9848"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/categories?post=9848"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/blogs.ubc.ca\/lfsgrads\/wp-json\/wp\/v2\/tags?post=9848"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}