Over the past few weeks, our group has been planning and organizing the construction stage of this project and has accomplished the following tasks:

  • On February 25, the team met as a group to discuss further plans of action including  where and how to build the wardrobe, incorporating a safety plan, and a timeline for the project
  • On February 28, we met with our mentor (Andrew).  He suggested some design changes (including adding baskets at the bottom of our wardrobe instead of drawers), and advised that we produce detailed project documentation (plans, cut sheets, safety plan, budget, schedule, etc.).
  • On March 2, some of the team members visited Rona near CityReach and did a detailed analysis of material types, quantities, and costs needed for the wardrobe’s completion (see attached list).
  • On March 6, the team had an extensive meeting regarding the final steps needed to successfully complete the project on time.  We decided to use 5/8″ MDF (medium density fibreboard) sheets for the components of the wardrobe as this is a cost-effective and visually pleasing material (see attached image for an example of MDF).
  • Over the last week we have put together a rough budget, a materials and tools list, and a preliminary safety plan

MDF material to be used for the Wardrobe
Source: http://forums.peavey.com/viewtopic.php?f=19&t=28901

Materials List
Part Unit Quantity Cost Total
5/8″ MDF 4×8 Sheet 4 $30.00 $120.00
Wire Basket Ea 2 $18.00 $36.00
Door Hinge Ea 4 $10.00 $40.00
Anti-Slip Cabinet Feet Pk 1 $6.00 $6.00
1-1/8″x4′ Wood Dowel Ea 1 $12.00 $12.00
Closet Rod Holder Pk 1 $4.00 $4.00
6′ Zinc Pilaster Strip Ea 4 $5.00 $20.00
Zinc Pilaster Shelf Clips Pk 2 $5.00 $10.00
Cabinet Door Pull Ea 2 $10.00 $20.00
Magnet Catch Ea 2 $4.00 $8.00
#8×1-1/2″ Wood Screws lb 5 $3.00 $15.00
Misc. Hardware Ea 1 $10.00 $10.00

All this has been done while being in close contact with our client at CityReach, Dave, who has approved our design.

An organizer at CBEL also recently contacted our team for approval to have a photographer take photos of the project being implemented.  He is interested because of the hands-on nature of the construction of the wardrobe.

Here is a list of expected tasks and completion dates for the next couple weeks:

  • Over the next week, we will draw up a detailed CAD drawing of the wardrobe with dimensions and material types and sizes.  Also, the budget, safety plan, and construction plan will be finalized.
  • March 13 @ 11AM – the team will meet Dave at Rona to procure all necessary materials.  We plan to use the UBC van and take the materials back to store in the Engineering Design Centre.
  • After getting the materials and finalizing the plans, we will proceed to construct most probably using the Rusty Hut and Civil Workshop at UBC.  We are also in discussion with a Plant Operations volunteer who may help out with the construction.

At this stage, the following current responsibilities have been assigned to the team members:

  • Daniel – safety plan and continued contact with our mentor
  • Geoff – make sure the UBC van is available to be taken on March 13 to Rona
  • Matt Van Goor – budget and materials and tools list, construction plan
  • Matt Kolec – draw the plans in CAD
  • Angelica – project documentation
  • Gerald – contact the client about changes and upcoming plans

We very much look forward to actually constructing the wardrobe for City Reach in the next couple weeks, and realize the the keys to success are detailed planning and taking care to be safe and accurate in the construction.

Introductions

Our community based experiential learning project (CBEL) involves designing and building of a wardrobe closet for the storage of dress-up clothes for the City Reach Care Society. This project has been changed from the original plan of a sandbox at request of the client, Dave McManus. The details of the project are unsure as the client is still trying to figure the new design after the change from the sandbox. This gives an opportunity to have a larger leadership role in the design process, as things are very tentative. Our group is very excited about the project and look forward to working together with our client.

The group that will be working on this project are all second year Civil Engineering students at UBC.  Our mentor is Andrew Chutskoff.

From left to right:

Matt Kolec (Leader/Organizer)
Matt Van Goor (Document Manager)
Angelica Wong (Secretary)
Gerald Epp (Client Liaison)
Geoff Krahn (Blogger)
Daniel Sohn (Mentor Liaison) – not shown

Our client is CityReach Care Society (http://www.cityreach.org/), based in East Vancouver. Among other community activities, CityReach runs a Food Bank, Food Kitchen, and an Out of School Care program. Their vision is to “help families and individuals in our community prosper in all areas of life.”

Our project is for their Out of School Care program that supports children (ages 5 to 12). Through day camps and weekly clubs at City Reach’s Warehouse facility, the kids are encouraged to cultivate life skills and talents and to mature as individuals.

We look forward to meeting with our client in the coming week. We will be able to work together with him in order to develop a more concrete plan for the project.