Posted by: | 22nd Mar, 2013

Blog Post 5 – Progress

This blog post describes what our team has done so far, and what remains.

By now, most of the work is done. Last week, Nicole took the drawings to NS ConneXions for the client to look over them. In addition to receiving feedback on what he liked about each post, and what design he preferred, we also gained details on the dimensions of the room.

Each team member submitted 2 portions: a plan for the upper floor, and the lower floor. Of the 10 designs, Mike chose Nicole’s design for the first floor, and David’s floor the second floor. Additionally, he mentioned thoughts on how to divide the first floor, using partitions to divide larger meeting rooms.

Notes from the meeting with the client

With this information in hand, we proceeded to work on the final products. To meet the poster deadline, the 3 final CAD drawings, including a new design for a more minor second floor modification, are to be done this weekend. The final outcome design for this project will be brought to the client likely during the coming week. The end of the project draws near!

Leave a response

Your response:

Categories

Spam prevention powered by Akismet