Capstone Project Proposal of Carbon Capture and Storage Phase II
Yaoyao Hu, MEL Candidate | December 2020 APPP 506 – Master of Engineering Leadership Capstone Project, University of British Columbia ABSTRACT: This capstone project is called Carbon Capture and Storage Phase II. In light of the recently declared Climate Emergency at UBC, carbon capture and storage and utilization technology is a necessary pathway to transition […]
Hydrogen Economy in Canada – Production
Robin Watts, MEL Candidate | December 2020 APPP 506 – Master of Engineering Leadership Capstone Project, University of British Columbia Abstract This study was aimed at performing an economic assessment of hydrogen production by electrolysis of water. The Levelized cost of hydrogen production (LCOH) is evaluated for different Canadian provinces using intermittent electricity from in-house […]
Hydrogen Economy- Distribution
Srikanth Narayan | December 18, 2020 APPP 506 – Master of Engineering Leadership Capstone Project, University of British Columbia Abstract Developing a hydrogen transmission and distribution infrastructure would be one of the challenges to be faced as we move toward a hydrogen economy. Initial uses of hydrogen are likely to involve a variety of transmission […]