Assignment 4 – Madison Drapkin

In Class:

 

At Home:

For this assignment, I tried to analyze a stormwater management system that is a part of the new developments on Cypress Mountain. The surrounding area is still under construction but the water system has been designed to control the flow of water down the mountain face which intersects with the new development and public trail system. At this location, the water flows down and through the mountain face and is pooled into three tiered ponds before continuing its way below a small pedestrian bridge and down the mountain some more.

Leave a Reply

Your email address will not be published. Required fields are marked *

Spam prevention powered by Akismet