Feb 8th, 2012 by kyzyang
After one month into the project, our team has presented multiple initial designs for the signage box. In the upcoming 2-3 weeks, our team will finalize the design and obtain the materials necessary to build the box. The construction and implementation of the box is expected to take a total of about 2 weeks. An initial schedule of our plans are shown in the chart below. We plan to have our design built and implemented one week after Reading Break (the week of the 27th of February.
The signage box will be built in the workshop at UBC. The completed box will then be transported to the Garden for implementation. Our group will look into obtaining the materials from Home Depot, Rona, and other specialty wood stores. We will spend this week checking prices of materials from the stores, and obtain the materials next week.
The three design options submitted to our client are shown below. Our team likes all three designs, and the client is currently deciding which design is favored.
The schedule seems reasonable to me and the designs are looking great!
Presumably you have a plan for construction – depending on which design the client chooses. I’ll have a look at your safety plan, work allocation plan, etc as part of the documentation portfolio.
Congratulations on this progress. It looks like you are almost there!
Regards,
SN