Project Update
Feb 15th, 2012 by kyzyang
After receiving feedback from our client, we have updated our design in accordance to their wishes. An image of the updated design can be seen below.
Our group is currently arranging a meeting with UBC’s workshop technicians so that we can start building the pieces of the box.
This week we will finalize the materials and cost list. We plan to obtain the material after the midterm break and have the pieces cut and prepared in UBC’s workshop. The box is expected to be completed one week after the material is obtained and will be completed before being transported to the garden to be mounted.