Reading Break
Feb 18th, 2012 by kyzyang
Reading Break has just started and our team plans to use this time to gather the materials and enter the construction stage for the signage box.
With regards to the box itself, after some consideration, it was decided that the shapes of the frame’s design should be a bit larger and thicker so that it is stronger, more easily seen, and is easier to be built. A picture of the updated design with its dimensions is shown below and an estimate of the box’s total cost will be sent out in the next few days.
The wood and Plexiglas (or glass depending on the response of our client) will be obtained during the Reading Break as soon as some sort of payment for the box is received.
After meeting with the technicians, it was concluded that the technicians will cut the pieces for the design, but will leave it up to our team to assemble and paint the box. The assembly of the box can be done in the wood shop, but we have yet to determine a location where we can paint it (although we have a few places in mind). The assembly and painting will most likely happen during the first week back from Reading Break. After that the box should be ready to be mounted at the Garden sometime the following week.