Categories
Uncategorized

Project Update

After receiving feedback from our client, we have updated our design in accordance to their wishes. An image of the updated design can be seen below.

Our group is currently arranging a meeting with UBC’s workshop technicians so that we can start building the pieces of the box.

This week we will finalize the materials and cost list. We plan to obtain the material after the midterm break and have the pieces cut and prepared in UBC’s workshop. The box is expected to be completed one week after the material is obtained and will be completed before being transported to the garden to be mounted.

 

Updated Design
Updated Design

Leave a Reply

Your email address will not be published. Required fields are marked *

Spam prevention powered by Akismet