Today our group brought the completed signage box to the Sun Yat-Sen Garden. The box was dropped off with the staff members and a picture of our entire team with the box can be seen below.
This post marks the end of our CSL project. We enjoyed working with the staff of Sun Yat-Sen Garden and definitely won’t forget this experience! We hope the S.Y.S. Garden enjoys the box!
During the past 7 days, the box was assembled and painted. Images of the box at various stages of the assembly as well as its final completed form can be seen below.
We have contacted our client and hope to deliver the box probably Tuesday of this upcoming week. We will not mounting the actual signage as that will be done by the client.
There will be one final blog post detailing the day that the signage box is delivered.
It has been one school week since Reading Break finished. The following includes a recap of what was done during the break, and what is currently happening.
During the break, members of our team met up with our client to confirm the final design and budget. The money for the materials was acquired and the materials have been obtained over the break.
This week, the materials were cut into various sections (some of which are seen in the images below). All that remains is to assemble the pieces together and paint the final box, which our team plans to do this Saturday. The box is expected to be completed by Sunday at latest depending on how long the paint takes to dry and will be ready to be mounted next week.