Unit 5 – Release Engineering

Thank you, Dorothy, for such an insightful workshop! I learn something new every year 🙂

Slides for Workshop 5: Release Engineering

Assignment 5 DUE MONDAY, JULY 20 @ 10pm: Assignment 5 pdf    Assignment 5 txt
(To hand in, simply make sure all your code is pushed to a private repo, and then don’t make any changes past the due date.)

Project Progress 5 DUE SATURDAY JULY 25 @10am (before workshop 6): Project Progress 5 pdf    Project Progress 5 txt
(To hand in, simply make sure all your code is pushed to your project group repo on a branch called “project_5” before the due date.)

Don’t forget your scrum report is due tonight at 10pm! Include your csid in your report.

Also, remember to complete the Workshop 5 Survey.

 

———————————————————————————

Pre-workshop

Please read the following pre-workshop material before the workshop Saturday July 11th:

Pre-workshop-Reading-Release-Engineering.pdf