Assignment 5 – April, Jenny, Nicola, Soyeon

Site map

 

Site map with observations.

 

Rainwater runoff carries pollutants on the street surfaces entering open water.

 

 

Waterlogging problems on sidewalks.

 

Limited distance between bike land and bus lane on Georgia st.

 

Water accumulation on blocking water catch basins.

 

Traffic noise problems.

 

Insignificant landscape design features.

 

Vision+Goals+Objectives