Box of moving items
After months of planning and anticipation, construction on the second floor of brock hall is about to begin. As of Tuesday, May 10, everyone located in the central and north ends of room 2016 has been relocated to temporary office space until construction is complete (expected to be late August). Please note that room 2001 is not available for room bookings until further notice.

The south end of room 2016, where the Undergraduate Admissions office is located, was recently refurbished and is not included in the current construction project. Admissions staff:  Let Shaun Boulieau know if you have questions about the 2nd floor construction project.

Contacting relocated staff

Staff phone numbers have not been impacted by the move. See below for relocation details.

2nd floor
1933 West Mall Annex

Enrolment Services:

Please note that campus mail should still be directed to Brock Hall room 2016. Campus mail should not be sent to the West Mall Annex location. Make arrangements as necessary to hand deliver any urgent documents requiring signatures directly to West Mall Annex.

  • Room 201: Kate Ross and Darran Fernandez
  • Room 202: Judy McGuigan
  • Room 203: Maggie Hartley and Kristen Harvey
  • Room 207: Christopher Eaton – room 207
  • Room 209: Amandeep Breen
  • Room 211: Kyle McCleery
  • Room 213: Meghan Phillips and Laurie Cameron

SASI:

  • Room 200A: Stuart Bourhill
  • Room 205: Asima Zahid
  • Room 204: Dorothy Paukste
  • Room 208: Jen Duggan, Brett Lee, Carolyn O’Connor, Marianne Boyles, Perline Er, Michael Eastwood, Debbie Mason, Aaron Levisohn
  • Room 216: Alena Chavdarova, Tara MacDonald, Barbara Thirlwell, Steve Knittel (to May 13), Sally McKenzie, Otis Dobai (splits time in BH 0040), Title Jirakul (student)

Room 0072
Brock Hall basement

  • Otis Dobai (splits time with West Mall Annex)

Room 0072
Brock Hall basement

Desktop Services:

  • Linda Yu
  • Garrett Dodd
  • Trask Nattrass